ROAD FREIGHT AFRICA
Home Transport & Logistics Services Company Information Contact Concargo More
ROUTE DETAILS

Trade Corridors


  Angola
  Botswana
  Democratic Republic of Congo (DRC)
  Kenya
  Lesotho
  Malawi
  Mozambique
  Namibia
  Swaziland
  Tanzania
  Uganda
  Zambia
  Zimbabwe
  ANGOLA ROUTE DETAIL

  Cape Town to Noordoewer (SA / Namibia border) via the N7
  Noordoewer to Oshikango (Namibia / Angola Border) via the B1
  Hand docs to agent and wait in queue and wait for customs to clear
  Once cleared, truck crosses to Angolan side where docs are again submitted to customs for clearance
  Once cleared, the driver must leave the camp area before 17h00, otherwise he has to wait until the following day
  From the border to Xangongo the road is fairly good and is tarred
  From there you cross the Kunene river over a low water bridge which can be under water during the rain season, one then has to wait until the water subsides before driving across. A new bridge is under construction
  From Xangongo to Chitemba, approximately 100 km, the road is very bad and in certain places one cannot travel faster than 20kph, and in the rainy season it is even worse
  From Lubango to Cacula the road is tarred
  Past Quilengues is a small mountain pass that is very difficult to negotiate when it is raining. Trucks can be delayed for more than a day at this point
  After the pass the road is a dirt road up until about 100 km before Benguela where the road is tarred
  There is another mountain pass just before Sumbe which becomes very slippery during the rainy season and also causes delays
  From there on to Luanda the road is good

Tracking

  Mobile reception areas: Oshikango, Cahama, Xangongo, Lubango, Benguela through to Luanda
  Satellite tracking not 100%
  Radio communication with supervisor
  Road Bond – R5 000 000.00
  Border Agents – SA NAM & Jan Snyman
  BOTSWANA ROUTE DETAIL

  N4 from Gauteng to Zeerust
  R49 from Zeerust to Kopfontein (SA / Botswana border)
  A1 from Gaborone to Mochudi, Mahalapye, Palapye, Serule, Francistown
  A3 from Francistown to Sebina, Maun
  A1 from Gaborone to Ramotswa, Lobatse
  A2 from Lobatse to Kanye, Jwaneng, Kang, Tshootsha and A3 to Ghanzi
  A1 from Gaborone to Palapye, Palapye to Serowe, Orapa
  A1 from Gaborone to Serule, Serule to Selebi Pikwe
  A1 from Francistown to Nata, north from Nata to Kasane
  A12 from Gaborone to Molepolole

Botswana's total road network is approximately 18 000 kilometres, of which approximately 6 000 kilometres is paved.

Botswana has become an important trade gateway between Gauteng and the West Coast via the Trans-Kalahari Corridor, a 1 900 kilometre road link from Johannesburg / Pretoria to the Port of Walvis Bay.
  DEMOCRATIC REPUBLIC OF CONGO (DRC) ROUTE DETAIL

Via Zimbabwe

  N1 from Gauteng to Beitbridge (SA / Zimbabwe border)
  A4 from Beitbridge to Harare
  A1 from Harare to Chirundu (Zimbabwe / Zambia border)
  T2 from Chirundu to Lusaka and Kapiri Maposhi via Kabwe
  T3 from Kapiri Maposhi to the Copper Belt
  T3 from the Copper Belt to Kasumbalesa (Zambia / DRC border)
  N1 from Kasumbalesa to Lubumbashi – Likazi – Tenke – Kolwezi

Via Botswana

  N4 from Gauteng to Zeerust
  R49 from Zeerust to Kopfontein (SA / Botswana border)
  A1 from Gaborone to Francistown
  A3 from Francistown to Nata
  North from Nata to Kazungula (Botswana / Zambia border)
  M10 from Kazungula to Livingstone
  T1 from Livingstone to T2 intersection via Choma and Mazabuka, left onto T2 to Lusaka and Kapiri Maposhi
  T3 from Kapiri Maposhi to the Copper Belt
  T3 from the Copper Belt to Kasumbalesa (Zambia / DRC border)
  N1 from Kasumbalesa to Lubumbashi – Likazi – Tenke – Kolwezi

Roads in the DRC are generally in poor condition and are often impassable during the rainy season.

The road between Kasumbalesa and Lubumbashi is paved and in fair condition. The road from Lubumbashi to Kolwezi is in very poor condition
  KENYA ROUTE DETAIL

  N1 from Gauteng to Beitbridge (SA / Zimbabwe border)
  A4 from Beitbridge to Harare
  A1 from Harare to Chirundu (Zimbabwe / Zambia border)
  T2 from Chirundu via Lusaka and Kapiri Mposhi to Tunduma (Zambia / Tanzania border)
  A104 from Tunduma to Chalinze
  A14 from Chalinze to Nkunjini (Tanzania/Kenya dorder) via Segera
  A14 from Nkunjini to Mombasa
  A14 from Chalinze to Segera
  B1 from Segera to Arusha
  A104 from Arusha to Longido (Tanzania/Kenya border) to Nairobi
  B3 from Nairobi to Nakuru
  B4 from Nakuru to Eldoret

Kenya has approximately 63 265 kilometres of interurban roads of which approximately 8 933 kilometres are paved.

There is over 100 000 kilometres of rural roads and 14 500 kilometres of urban roads creating a total road infrastructure of 177 765 kilometres.

Kenya has some of the busiest roads south of the Sahara but maintenance is often neglected.
  LESOTHO ROUTE DETAIL

  N1 / N8 from Gauteng via Maserubrug (SA/Lesotho border) to Maseru
  A2 from Maseru to Mazenod and Mafeteng
  A20 from Mafeteng to Mohales Hoek
  A2 from Mohales Hoek to Quthing
  A3 / A5 from Maseru to Roma
  A1 from Maseru to Teyateyaneng – Maputsoe – Leribe – Butha Buthe

Lesotho has a network of over 2000 kilometres of tarred road which is supplemented by over 6000 kilometres of gravel roads and (murrum) dirt roads.

The tarred roads connecting the major towns are good.

The use of large vehicle combinations, ie tri-Axles, superlinks etc. are subject to the location of the destination town. A lot of the towns are situated in outlying areas which are accessible by very narrow and winding mountain roads.
  MALAWI ROUTE DETAIL

  N1 from Gauteng to Beitbridge (SA / Zimbabwe border)
  A4 from Beitbridge to Harare
  A2 from Harare to Nyamapanda (Zimbabwe / Mozambique border)
  Route 103 from Nyamapanda via Tete to Mwanza (Mozambique / Malawi border)
  M6 / M1 South from Mwanza to Blantyre
  M2 from Blantyre to Luchenza
  M3 from Blantyre to Zomba and Mangochi
  M6 / M1 North from Mwanza to Dedza, Lilongwe, Kasungu, Mzuzu and Karonga
  M6 / M1 / M5 from Mwanza to Salima

The road network in Malawi comprises of approximately 14000 km of which about 3000 km is tarred.

Malawi's main highways are in a generally fair condition. The secondary roads are in a poor state of repair and are in the main impassable during the rainy season (November to April).
  MOZAMBIQUE ROUTE DETAIL

  Johannesburg to Lebombo / Ressano Garcia (SA / Mozambique Border) via N4
  Ressano Garcia to Maputo via EN4
  At Ressano Garcia customs will process a Memorandum document which is issued to the driver enabling him to proceed to Frigo in Maputo for final customs clearance
  Cargo has to be cleared at Frigo before moving on to final destination
  Customs clearance at Frigo can take between 24 – 48 hours

  Maputo to Beira via EN1 to Inchope, EN6 from Inchope to Beira
  Maputo to Chimoio via EN1 to Inchope, EN6 from Inchope to Chimoio
  Maputo to Quelimane via EN1 to Inchope up to Caia to Inguadala to Quelimane
  Maputo to Tete via EN1 and EN6 towards Bandula and route 102 north to Tete
  Maputo to Nacala via EN1 to Inchope up to Caia to Inguadala, EN7 from Inguadala to Nicuadala, route 104 from Nicuadala to Alto Mol๒cu้, route 232 from Alto Mol๒cu้ to Namialo, EN8 from Namialo to Nacala
  Maputo to Pemba via EN1 to Inchope up to Caia to Inguadala, EN7 from Inguadala to Nicuadala, route 104 from Nicuadala to Alto Mol๒cu้, route 232 from Alto Mol๒cu้ to Namialo, route 106 from Namialo to Pemba

The road network in Mozambique is about 30 000 kilometres of which only 10 000 kilometres is tarred. The road network is now 90% passable compared with only 65% in 2004.

A new bridge over the Zambezi river, linking Sofala and Zambezia provinces has recently been completed. This bridge is a key link in the countries main South – North highway and has replaced the unreliable ferry service over the Zambezi.
  NAMIBIA ROUTE DETAIL

  Cape Town to Vioolsdrift / Noordoewer (SA / Namibia Border) via N7
  Johannesburg to Skilpadshek (SA / Botswana Border) via N4
  Skilpadshek to Buitepos (Botswana / Namibia Border) via the Trans Kgalagadi Highway
  Buitepos to Gobabis / Windhoek via B6
  Noordoewer to Windhoek, Otjiwarongo, Tsumeb and Oshikango via B1
  Noordoewer to Lderitz via B1 to Keetmanshoop and B4 from Keetmanshoop to Luderitz
  Noordoewer to Gobabis via B1 to Windhoek and B6 from Windhoek to Gobabis
  Noordoewer to Swakopmund / Walvis Bay via B1 to Windhoek and B2 from Windhoek to the coast
  Noordoewer to Rundu via B1 to Otavi and B8 from Otavi to Rundu

The Namibian road network consists of 42 260 kilometres of road of which about 6 000 kilometres is surfaced. The surfaced roads consists of selected and well compacted natural gravel materials covered with a bituminous top layer as well as about 200 kilometres of salt road along the coastline.
  SWAZILAND ROUTE DETAIL

From Gauteng

  N17 from Gauteng to Oshoek (SA / Swaziland border)
  MR3 from Oshoek to Ngwenya – Mbabane – Ezulwini – Matsapha – Manzini – Siteki
  MR4 from Matsapha to Malkerns
  MR19 from Mbabane to Bhunya
  MR1 from Ngwenya to Piggs Peak
  MR9 from Matsapha to Hlatikulu – Nhlangano
  MR3 from Manzini via MR8 – Big Bend
  MR3 from Manzini to Siteki – Simunya

From Durban

  N2 from Durban to Golela (SA / Swaziland border)
  MR8 from Golela / Lavumisa to Big Bend
  MR16 from Big Bend to to Siteki – via MR3 – Simunya
  MR8 from Big Bend via MR3 to Manzini – Matsapha – Ezulwini – Mbabane
  MR11 from Lavumisa to Nhlangano & MR9 from Nhlangano to Hlatikulu – Manzini – Matsapha

Swaziland has a classified road network of about 3 800 kilometres, a third of which is paved.

60% of the paved network is in a good condition.
  TANZANIA ROUTE DETAIL

  N1 from Gauteng to Beitbridge (SA / Zimbabwe border)
  A4 from Beitbridge to Harare
  A1 from Harare to Chirundu (Zimbabwe / Zambia border)
  T2 from Chirundu via Lusaka and Kapiri Mposhi to Tunduma (Zambia / Tanzania border)
  T1 from Tunduma to Mbeya and Dar es Salaam
  T1 from Tunduma to Morogoro, T3 from Morogoro to Dodoma
  T1 from Tunduma to Chalinze, T2 from Chalinze to Segera, T13 from Segera to Tanga
  T1 from Tunduma to Chalinze, T2 from Chalinze to Arusha
  T1 from Tunduma to Mbeya, T8 from Mbeya to Mwanza

Tanzania's total road network is approximately 86 472 kilometres. The trunk and regional road network consists of approximately 29 847 kilometres of which approximately 5 708 kilometres is paved. The remaining 56 625 kilometres is made up of urban, district and feeder roads.

70% of the trunk and regional roads are in good condition while the remainder varies from fair to poor condition. Dirt roads can become impassable during the rainy seasons.
  UGANDA ROUTE DETAIL

  N1 from Gauteng to Beitbridge (SA / Zimbabwe border)
  A4 from Beitbridge to Harare
  A1 from Harare to Chirundu (Zimbabwe / Zambia border)
  T2 from Chirundu via Lusaka and Kapiri Mposhi to Tunduma (Zambia / Tanzania border)
  A104 from Tunduma to Chalinze
  A14 from Chalinze to Nkunjini (Tanzania/Kenya dorder) via Segera
  A14 from Nkunjini to Mombasa
  A14 from Chalinze to Segera
  B1 from Segera to Arusha
  A104 from Arusha to Longido (Tanzania/Kenya border) to Nairobi
  B3 from Nairobi to Nakuru
  B4 from Nakuru to Eldoret
  A104 from Eldoret to Malaba (Kenya/Uganda border)
  A109 from Malaba to Bugiri – Iganga – Nejeru – Lugazi – Mukono – Kampala

Uganda has a network of over 2 000 kilometres of paved roads and is supplemented by over 6 000 kilometres of good quality murram (dirt) road and feeder routes.
  ZAMBIA ROUTE DETAIL

Via Zimbabwe

  N1 from Gauteng to Beitbridge (SA / Zimbabwe border)
  A4 from Beitbridge to Harare
  A1 from Harare to Chirundu (Zimbabwe / Zambia border)
  T2 from Chirundu to Lusaka and Kapiri Maposhi via Kabwe
  T3 from Kapiri Maposhi to the Copper Belt

Via Botswana

  N4 from Gauteng to Zeerust
  R49 from Zeerust to Kopfontein (SA / Botswana border)
  A1 from Gaborone to Francistown
  A3 from Francistown to Nata
  North from Nata to Kazungula (Botswana / Zambia border)
  M10 from Kazungula to Livingstone
  T1 from Livingstone to T2 intersection via Choma and Mazabuka, left onto T2 to Lusaka

Zambia's road network comprises 21 000 km of main, trunk and district roads, 16 000 km of urban and feeder roads and 30 000 km of un-gazetted roads.

The roads between the main centres are mostly tarred and are in fair condition whilst the remainder of the network is in a generally poor state of repair.
  ZIMBABWE ROUTE DETAIL

  N1 from the Cape and Gauteng and N3 and N1 from Kwazulu Natal to Beitbridge
  Beitbridge to Masvingo and Harare via A4
  Beitbridge to Bulawayo via A6
  Beitbridge to Gweru and Kwekwe via A6 to Bulawayo and A5 from Bulawayo to Gweru / Kwekwe
  Beitbridge to Mutare via A4 to Masvingo and A9 from Masvingo to Mutare

The Zimbabwean road network consists of approximately 18 340 kilometres of road of which about 8 692 kilometres is tarred.

Road conditions along the main routes are generally in a fair but deteriorating and potholed condition.

Print  |  Email
Have Us Contact You
Call us - 0860 252627
International Enquiry
Why Use Concargo?
Chairman's Message
Terms & Conditions |  Privacy Policy |  Accessibility |  Associations

PAIA |  Site Map |  Copyright Concargo (Pty) Ltd

View Concargo Mobile

Find us on Twitter

Read our blog
Find us on Facebook

Find us on LinkedIn
Fuel Surcharge
GlossaryTools
Glossary
Conditions of Carriage